HYDRO-QUÉBEC requested the integration of a new substation (735 kV), the relocation of T3 and the L2 line. This large-scale project included the clearing of land as well as the management of large quantities of contaminated soil. This project, which involved switchgear, control, electrical and fit-out operations, required advanced civil engineering and architectural expertise to ensure the installation of major equipment and its required infrastructure.